[c-nsp] Cisco 6509 and Bus speeds
Paul Schopis
pschopis at oar.net
Thu Jan 13 11:17:35 EST 2005
just my 2 cents worth. I also looked at
http://www.cisco.com/en/US/products/hw/switches/ps708/
prod_module_installation_guide09186a0080163594.html#wp60133
and quoted in there is " Important Note: You cannot have a DFC in a
system with a Supervisor Engine 720."
could be important
Paul
On Jan 13, 2005, at 8:32 AM, Arnold Nipper wrote:
> On 13.01.2005 13:45 Marcel Lemmen wrote
>
>> The c6509 with Sup720 can handle 720Gbps of switching traffic in
>> total,
>> but what happens if I transfer 40Gbps from one slot to the other slot
>> with
>> 4x10GE (since we have 8 10GE ports)? As far as I know the c6509 has a
>> 8Gbps backplane and therfor you shouldn't be able to transfer more
>> then
>> 8Gbps from one slot to another, or am I wrong in this one?
>
> The buildt-in switching fabric can handle 40Gbps
>
>> Using dCEF it
>> would be possible to transfer 40Gbps of traffice within one slot but
>> not
>> between slots or not?
>
> You are able to transfer 40Gbps of traffic between two slots as well
>
> Have a look
> http://www.cisco.com/en/US/products/hw/switches/ps708/
> products_qanda_item09186a0080159963.shtml for more information
>
>
>
> Arnold
> _______________________________________________
> cisco-nsp mailing list cisco-nsp at puck.nether.net
> https://puck.nether.net/mailman/listinfo/cisco-nsp
> archive at http://puck.nether.net/pipermail/cisco-nsp/
>
///////////////////////////////////////////////////////
Paul Schopis Director Network Engineering and Operations
Email pschopis at oar.net
Ph. 614.292.1956
More information about the cisco-nsp
mailing list