On Mon, 2009-01-26 at 08:45 -0600, Tony Varriale wrote:
> This is how I normally do it.
> 
> 1) archive software to first switch /overwrite (from TFTP) without reload.
> 2) archive software to second switch /overwrite without reload.
> 3) reload slot 1
> 4) wait until switch 1 is operational and you are happy
> 5) reload slot 2

Will this work? Wouldn't Stackwise see the two switches as incompatible?
We've started using pairs of 3750E with a CX4 link between them and just
plain rapid PVST+. Then we have some "guarantees" as to how the system
functions during upgrades.

Regards,
Peter