[c-nsp] testing physical links between production and non-production switches
sam avi
sam.avi9009 at hotmail.com
Wed Jul 22 09:26:45 EDT 2009
Hi,
I have a set of access switches (3750s), which are purely in a layer 2 setup, i.e. connect uplink to core 6509s, which are setup as root and backup spanning-tree roots.
I need to connect another set of switches to the above 3750s in a migration, but would like to be able to test the physical layer before-hand to avoid surprises on the migration day.
One "safe" way I thought I could do this interim step was to make the switch ports into routed ports, i.e "no switchport". This should clear off any spanning-tree hiccups when I'm doing a physical level test. Once this goes ahead ok, then I plan to shut down the ports and later configure them as standard L2 ports.
Any comments? Is there any other way I can do such an interim test in a "safe" way, i.e without affecting other production traffic on the 3750s?
---sam
_________________________________________________________________
What goes online, stays online Check the daily blob for the latest on what's happening around the web
http://windowslive.ninemsn.com.au/blog.aspx
More information about the cisco-nsp
mailing list