[c-nsp] 10G for 6506-E with Sup32-8Gb or replace with 4900M
Gert Doering
gert at greenie.muc.de
Thu Dec 23 09:32:41 EST 2010
Hi,
On Thu, Dec 23, 2010 at 02:05:25PM +0000, Holemans Wim wrote:
> Now we are thinking about connecting both routers to each other on each campus with a 10G connection. As the Sup32 don't have a 10G yet, we have multiple options to do so.
> We can add a 10G board to the chassis, replace the supervisor with a Sup720 or replace the whole router with a 4900M.
JFTR: you can *not* add a 10G board to the chassis. The Sup32 has no
fabric, and the 10G boards are fabric-only (67xx).
You could do Sup720-10G or Sup32-10G, though. Or Sup720 + 6704/6708.
If you only need 2 or 4 10G ports, and can live with the slow CPU and
limited routing table, Sup32-10G sounds like the best plan forward.
gert
--
USENET is *not* the non-clickable part of WWW!
//www.muc.de/~gert/
Gert Doering - Munich, Germany gert at greenie.muc.de
fax: +49-89-35655025 gert at net.informatik.tu-muenchen.de
-------------- next part --------------
A non-text attachment was scrubbed...
Name: not available
Type: application/pgp-signature
Size: 305 bytes
Desc: not available
URL: <https://puck.nether.net/pipermail/cisco-nsp/attachments/20101223/0fea221b/attachment.bin>
More information about the cisco-nsp
mailing list