1000BASE-BX-U connects to 1000BASE-BX-D, no problem there. Is there a general standard for installation, like 1000BASE-BX-U is installed in the Upstream equipment, 1000BASE-BX-D is installed in the Downstream equipment? That would make sense, but I'd rather not find out I'm deploying these the opposite way around than most people... -- Tim:>