IT-28 Capacitor Tester question

Sandy and Kees Talen windy10605 at JUNO.COM
Tue Dec 18 20:04:45 EST 2001


Oh, forgot ....you perform the leakage test by attaching the leads to the
(loose)
capacitor (observe polarity on electrolytics), adjust the voltage to the
capacitor
rated voltage, and move the lever from "bridge", past "discharge",  to
"leakage".
Always move the switch back to "discharge" before removing the capacitor
so
it's discharged and don't touch the terminals when it's in the "leakage"
mode.

Kees

-----------------------------------------------------------
This list is a public service of the City of Tempe, Arizona
-----------------------------------------------------------

Subscription control - http://www.tempe.gov/lists/control.asp?list=HEATH
To post - HEATH at LISTSERV.TEMPE.GOV
Archives - http://interactive.tempe.gov/archives/HEATH.html




More information about the Heath mailing list