Hello We connect our devices to a 4200 and run layer 2 to an AE on the 960. The layer 3 is on the ae on the 960. Currently the layer 3 stays up when the physical layer port is down on the 4200. Is there a way to have the layer 3 shutdown when the physical port on the 4200 is down? Thank you