Hi Mehmet,
I apologize for a very slow response. I’ve been neck deep with network integration. I hope to catch with you before year end if not early part of January 2019.
—
regards,
/vrode
> On Oct 31, 2018, at 09:52, outages <virendra.rode at outages.org> wrote:
>
> Thanks Mehmet. Will ping you offline.
>
> —
> regards,
> /vrode
>
>> On Oct 31, 2018, at 09:01, Mehmet Akcin <mehmet at akcin.net> wrote:
>>
>> by the way wanted to share some screenshots of what we are developing.
>>
>> https://drive.google.com/drive/folders/1JsV7QRaWkzj9W3oEwJe7Qm-vqwXjOdu3?usp=sharing
>>
>> if you are interested in helping, please contact me offlist.
>>
>>
>>> On Wed, Oct 24, 2018 at 10:44 PM Mehmet Akcin <mehmet at akcin.net> wrote:
>>> Lets collaborate
>>>
>>>> On Wed, Oct 24, 2018 at 10:44 PM outages <virendra.rode at outages.org> wrote:
>>>> I was doing something similar. I started to plot outages & heatmaps on tracker.outages.org. I even got some google API hooks to report on weather storms similar to weather.com. I tried to scrape twitter & outages email feeds which was partially successfully as I had to manually vett these outages in the backend. Had to shelf it due to day job. Have some thoughts to resurrect tracker back to life.
>>>>
>>>> —
>>>> regards,
>>>> /vrode
>>>>
>>>>> On Oct 24, 2018, at 12:36, Mehmet Akcin via Outages <outages at outages.org> wrote:
>>>>>
>>>>> I am trying to get these type of outages reported on http://www.networkatlas.org for easy to visaual display
>>>>>
>>>>> Will you be able to tell me if centurylink has their kmzs available somewhere publicly? I have looked at but didn’t find it.(they have pdfs)
>>>>>
>>>>> Mehmet
>>>>>
>>>>>
>>>>>> On Wed, Oct 24, 2018 at 11:06 AM Brian Knight via Outages <outages at outages.org> wrote:
>>>>>> We've heard that splicing has been going on for the past several hours
>>>>>> on the 264-count cable. Estimated time to finish that splice is 20:00
>>>>>> GMT.
>>>>>>
>>>>>> -Brian
>>>>>>
>>>>>> On 2018-10-24 07:43, Brian Knight via Outages wrote:
>>>>>> > Got a Level 3 fiber cut in San Bernardino, CA going on for about 17
>>>>>> > hours now. Our first link alarm was at 3:47pm CT yesterday. $DAYJOB
>>>>>> > has two 1G circuits affected.
>>>>>> >
>>>>>> > Looks like they had a hell of a time getting the replacement cable and
>>>>>> > splice conduit installed. Splicing is estimated to start in another
>>>>>> > 2.5-3.5 hours on the east side of the cut.
>>>>>> >
>>>>>> > Here's the latest we received from Level 3.
>>>>>> >
>>>>>> >
>>>>>> > 10/24/2018 12:29:56 GMT -
>>>>>> > *** CASCADED EXTERNAL NOTES 24-Oct-2018 12:22:53 GMT From CASE:
>>>>>> > 15371425 - Event
>>>>>> > The Outside Plant Engineer has reported that cable preparations on
>>>>>> > both the west side and the east side of the cable is ongoing. It is
>>>>>> > estimated splicing on the west side will begin at 14:00 GMT and
>>>>>> > splicing on the east side will begin between 15:00 GMT and 16:00 GMT.
>>>>>> >
>>>>>> >
>>>>>> > 10/24/2018 11:10:34 GMT -
>>>>>> > *** CASCADED EXTERNAL NOTES 24-Oct-2018 11:04:06 GMT From CASE:
>>>>>> > 15371425 - Event
>>>>>> > The Outside Plant Engineer has confirmed the trench is dug and the
>>>>>> > replacement cable is being ran between manholes at the west side of
>>>>>> > the damage. Preparations are complete at the east side and splicing
>>>>>> > expected to begin at 11:30 GMT with the 264 count cable, then the 84
>>>>>> > count cable followed by a 60 count lateral cable. Restoration efforts
>>>>>> > are ongoing with an ETTR that remains unchanged, 17:30 GMT.
>>>>>> >
>>>>>> >
>>>>>> > 10/24/2018 10:05:30 GMT -
>>>>>> > *** CASCADED EXTERNAL NOTES 24-Oct-2018 09:58:52 GMT From CASE:
>>>>>> > 15371425 - Event
>>>>>> > The Outside Plant Engineer reported the replacement section of cable
>>>>>> > got stuck when pulling it into position. A second splice enclosure
>>>>>> > will be installed in the next manhole. Field Operations will dig a
>>>>>> > trench between the two enclosures to complete the installation of the
>>>>>> > 2,400 foot section of 264 count replacement cable. The trench is
>>>>>> > expected to be complete at approximately 10:30 GMT with an estimated
>>>>>> > time splicing will begin of 12:30 GMT.
>>>>>> >
>>>>>> >
>>>>>> > 10/24/2018 08:08:37 GMT -
>>>>>> > *** CASCADED EXTERNAL NOTES 24-Oct-2018 08:01:50 GMT From CASE:
>>>>>> > 15371425 - Event
>>>>>> > The Outside Plant Engineer reported the replacement section of fiber
>>>>>> > cable has arrived and is currently being pulled into position. Along
>>>>>> > with the section of fiber cable, a new splice enclosure is being
>>>>>> > prepped and will be replaced to complete repairs of the 264 count
>>>>>> > cable. The 84 count cable has been prepped and ready for splicing.
>>>>>> > Field Operations have moved to an adjacent manhole looking for
>>>>>> > available slack to repair to the 168 count cable. The Outside Plant
>>>>>> > Engineer reported splicing is expected to commence at 10:00 GMT. The
>>>>>> > next update will be sent at that time or if additional information is
>>>>>> > received.
>>>>>> >
>>>>>> >
>>>>>> > -Brian
>>>>>> > _______________________________________________
>>>>>> > Outages mailing list
>>>>>> > Outages at outages.org
>>>>>> > https://puck.nether.net/mailman/listinfo/outages
>>>>>> _______________________________________________
>>>>>> Outages mailing list
>>>>>> Outages at outages.org
>>>>>> https://puck.nether.net/mailman/listinfo/outages
>>>>> --
>>>>> Mehmet
>>>>> +1-424-298-1903
>>>>> _______________________________________________
>>>>> Outages mailing list
>>>>> Outages at outages.org
>>>>> https://puck.nether.net/mailman/listinfo/outages
>>> --
>>> Mehmet
>>> +1-424-298-1903
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://puck.nether.net/pipermail/outages-discussion/attachments/20181219/e499a4c7/attachment.html>
More information about the Outages-discussion
mailing list