[Outages] Equinix Chicago - outages in some cabinets.

virendra rode // virendra.rode
Fri Jan 5 18:24:31 EST 2007


-----BEGIN PGP SIGNED MESSAGE-----
Hash: SHA1

Apparently a contractor punched a hole in the roof which caused water to
leak through the ceiling, causing power outages to one or two cages on
the 6th floor. It appears to the be contained now.



regards,
/virendra
-----BEGIN PGP SIGNATURE-----
Version: GnuPG v1.4.2.2 (GNU/Linux)
Comment: Using GnuPG with Mozilla - http://enigmail.mozdev.org

iD8DBQFFnt4vpbZvCIJx1bcRArBFAJoCj3fVZAbFsfAQbmeceaY7ApycMgCfTakx
p9B+A1ogIf9n6nxXpiDYGBU=
=K4fl
-----END PGP SIGNATURE-----



More information about the Outages mailing list