Hash: SHA1

Outage start time: 4/26/2009 - 3:28pm EST
Outage end time: 4/29/2009 - 2:45am EST

It appears this outage was a result of a transformer failure within
their power distribution panel at their Alpharetta data center.


Root Cause:

Failure of a defective transformer in a UPS system B distribution panel
which resulted in a loss of power to certain critical system components
in the data center. Apparently the system did not automatically failover
 to the redundant system A power as designed because system A power
distribution panel breaker was left in a non-redundant state for some
unknown reason. Consequently it took down their core network down
including their mainframe / midrange systems.



regards,
/virendra

-----BEGIN PGP SIGNATURE-----
Version: GnuPG v1.4.6 (GNU/Linux)
Comment: Using GnuPG with Mozilla - http://enigmail.mozdev.org

iD8DBQFJ+xpepbZvCIJx1bcRAiJxAJ0f6XuiihlaPTCqLRONDURCfmB/JwCg4zZ+
Nx/K+C2/r581ToekWIo0Dj8=
=A8Lb
-----END PGP SIGNATURE-----



More information about the Outages mailing list