So the outage was OK to have since they had staff on site?
On May 30, 2015 09:01, Paul WALL via Outages <outages at outages.org> wrote:
It's a good thing Hurricane Electric had electricians on site to deal
with the outage.
If it were an Equinix or Telx site, the response would have assuredly
been far worse.