Apparently the entire 3rd floor minus Level3 is out. Telx lost conEd power around 7:37P, and we saw everything shut down around 10:57P. Currently claiming something wrong between building gensets and power infrastructure on floor 3. No updates since 12:30AM (all EST). Anyone know more? <br>