<html>
<head>
<meta content="text/html; charset=ISO-8859-1"
http-equiv="Content-Type">
</head>
<body bgcolor="#FFFFFF" text="#000000">
I saw this on an email chain I am on:<br>
<br>
<ul style="margin-top:0in" type="circle">
<li class="MsoNormal"
style="margin-bottom:0in;margin-bottom:.0001pt;text-align:justify;line-height:normal;mso-list:l0
level2 lfo2"><b>111 8<sup>th</sup> Ave (NY)</b><o:p></o:p></li>
<ul style="margin-top:0in" type="square">
<li class="MsoNormal"
style="margin-bottom:0in;margin-bottom:.0001pt;text-align:justify;line-height:normal;mso-list:l0
level3 lfo2">Has 90,000 gallons of fuel, which is able to
provide up to 4 days of power<o:p></o:p></li>
<li class="MsoNormal"
style="margin-bottom:0in;margin-bottom:.0001pt;text-align:justify;line-height:normal;mso-list:l0
level3 lfo2">This facility experienced voltage fluctuations as
a result of a blown fuse on the main buss feeding several
tenants at the building. The fuse replacement in underway and
we should return to normal operating conditions momentarily.</li>
</ul>
</ul>
--John<br>
<div class="moz-cite-prefix">On 10/30/2012 12:44 AM, jeffrey arnold
wrote:<br>
</div>
<blockquote
cite="mid:CAGSdjxbSL34WwsQiOXgym=q3cYqQKUccBZQxyO_qxTrt26CNsA@mail.gmail.com"
type="cite">Apparently the entire 3rd floor minus Level3 is out.
Telx lost conEd power around 7:37P, and we saw everything shut
down around 10:57P. Currently claiming something wrong between
building gensets and power infrastructure on floor 3. No updates
since 12:30AM (all EST). Anyone know more? <br>
<br>
<fieldset class="mimeAttachmentHeader"></fieldset>
<br>
<pre wrap="">_______________________________________________
Outages mailing list
<a class="moz-txt-link-abbreviated" href="mailto:Outages@outages.org">Outages@outages.org</a>
<a class="moz-txt-link-freetext" href="https://puck.nether.net/mailman/listinfo/outages">https://puck.nether.net/mailman/listinfo/outages</a>
</pre>
</blockquote>
<br>
</body>
</html>