<html><head></head><body>It is. So unless that message that you reposted came to you with a flag line suggesting it should not be disseminated, you're welcome to post it here.<br><br>Cheers,<br>-- jr '<admin/>' a<br><br><div class="gmail_quote">On December 26, 2020 1:35:29 PM EST, Ross Tajvar via Outages <outages@outages.org> wrote:<blockquote class="gmail_quote" style="margin: 0pt 0pt 0pt 0.8ex; border-left: 1px solid rgb(204, 204, 204); padding-left: 1ex;">
<div dir="auto">Sorry I don't follow. Isn't the point of this list to keep people informed?</div><br><div class="gmail_quote"><div dir="ltr" class="gmail_attr">On Sat, Dec 26, 2020, 1:31 PM Luis Diaz <<a href="mailto:noc@riotgames.com">noc@riotgames.com</a>> wrote:<br></div><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex"><div dir="ltr">May want to consider moving this discussion to something more private. <div><br></div><div><br></div></div><br><div class="gmail_quote"><div dir="ltr" class="gmail_attr">On Sat, Dec 26, 2020 at 9:30 AM Ross Tajvar via Outages <<a href="mailto:outages@outages.org" target="_blank" rel="noreferrer">outages@outages.org</a>> wrote:<br></div><blockquote class="gmail_quote" style="margin:0px 0px 0px 0.8ex;border-left:1px solid rgb(204,204,204);padding-left:1ex"><div dir="auto"><div dir="auto">Latest update from AT&T:</div><div dir="auto"><br></div><div dir="auto"> </div><div dir="auto"><br></div><div dir="auto">AT&T Corporate Real Estate teams are now gathering on site after pausing work last night due a fire that reignited on site around midnight. The Fire Marshall has joined the AT&T team to provide official approval to proceed. Last night, the teams were able to accomplish testing the busbar, placing the temporary generators, completing power cabling, and opening all the breakers on the individual floors. It is estimated that this round of power related work is about 75% complete. The target is for energizing is 1200 CST. A partial analysis by the AT&T Structural Engineer initial found no concrete or steel damage that caused major concern. Once team re-engage this morning, they will complete their full analysis and ensure it is safe for restoration crews to proceed. AT&T Mechanical Engineers have confirmed there is roughly 3 feet of water in the basement with potential damage to mechanical equipment in that area. It is also suspected that commercial power may not be available for some time and as a result power will come from AT&T and Tennessee Emergency Management Agency generators. Additional technician support will be made available rotating over a 24 hour period.</div><div dir="auto"><br></div><div dir="auto">Core CBB teams continue to work on the secondary plan to reroute around the Nashville 2nd Ave location. They had some success this morning at 05:05 CT when core connectivity was established for the Winchester, KY office. Partial 911 connectivity has been restored in that specific area. Work will continue on the CBB reroute plans in several locations around the Southeast Region.</div><div dir="auto"><br></div><div dir="auto">We have installed a SatCOLT positioned in the area of the CO NSVLTNMT building and is up and taking traffic to aid in communication. The secondary SatCOLT arrived and has been turned up to provide additional coverage.</div><div dir="auto"><br></div><div dir="auto">The next update will be issued at approximately 13:00 CT, unless there is a significant change in status</div></div><br><div class="gmail_quote"><div dir="ltr" class="gmail_attr">On Fri, Dec 25, 2020, 7:49 PM Ross Tajvar <<a href="mailto:ross@tajvar.io" target="_blank" rel="noreferrer">ross@tajvar.io</a>> wrote:<br></div><blockquote class="gmail_quote" style="margin:0px 0px 0px 0.8ex;border-left:1px solid rgb(204,204,204);padding-left:1ex"><div dir="ltr">Got this internally, sharing here:<div><br><div><span style="color:rgb(29,28,29);font-family:Slack-Lato,appleLogo,sans-serif;font-size:15px;font-variant-ligatures:common-ligatures;background-color:rgb(248,248,248)">Here is the update from AT&T:</span><br style="box-sizing:inherit;color:rgb(29,28,29);font-family:Slack-Lato,appleLogo,sans-serif;font-size:15px;font-variant-ligatures:common-ligatures;background-color:rgb(248,248,248)"><span style="color:rgb(29,28,29);font-family:Slack-Lato,appleLogo,sans-serif;font-size:15px;font-variant-ligatures:common-ligatures;background-color:rgb(248,248,248)">></span><br style="box-sizing:inherit;color:rgb(29,28,29);font-family:Slack-Lato,appleLogo,sans-serif;font-size:15px;font-variant-ligatures:common-ligatures;background-color:rgb(248,248,248)"><span style="color:rgb(29,28,29);font-family:Slack-Lato,appleLogo,sans-serif;font-size:15px;font-variant-ligatures:common-ligatures;background-color:rgb(248,248,248)">> The front 1/3rd of their building is structuraly damaged.  That includes fiber entry.</span><br style="box-sizing:inherit;color:rgb(29,28,29);font-family:Slack-Lato,appleLogo,sans-serif;font-size:15px;font-variant-ligatures:common-ligatures;background-color:rgb(248,248,248)"><span style="color:rgb(29,28,29);font-family:Slack-Lato,appleLogo,sans-serif;font-size:15px;font-variant-ligatures:common-ligatures;background-color:rgb(248,248,248)">> They have no power and there is major flooding on all floors including the basement.</span><br style="box-sizing:inherit;color:rgb(29,28,29);font-family:Slack-Lato,appleLogo,sans-serif;font-size:15px;font-variant-ligatures:common-ligatures;background-color:rgb(248,248,248)"><span style="color:rgb(29,28,29);font-family:Slack-Lato,appleLogo,sans-serif;font-size:15px;font-variant-ligatures:common-ligatures;background-color:rgb(248,248,248)">> The Fire Department is en route with pump trucks to help with the flooding.</span><br style="box-sizing:inherit;color:rgb(29,28,29);font-family:Slack-Lato,appleLogo,sans-serif;font-size:15px;font-variant-ligatures:common-ligatures;background-color:rgb(248,248,248)"><span style="color:rgb(29,28,29);font-family:Slack-Lato,appleLogo,sans-serif;font-size:15px;font-variant-ligatures:common-ligatures;background-color:rgb(248,248,248)">> They have Building Engineers and Electricians on the way to  look into the structure and getting power turned on.</span><br style="box-sizing:inherit;color:rgb(29,28,29);font-family:Slack-Lato,appleLogo,sans-serif;font-size:15px;font-variant-ligatures:common-ligatures;background-color:rgb(248,248,248)"><span style="color:rgb(29,28,29);font-family:Slack-Lato,appleLogo,sans-serif;font-size:15px;font-variant-ligatures:common-ligatures;background-color:rgb(248,248,248)">> They have 2 850KW generators on the way and 2 1MW generators on standby.</span><br style="box-sizing:inherit;color:rgb(29,28,29);font-family:Slack-Lato,appleLogo,sans-serif;font-size:15px;font-variant-ligatures:common-ligatures;background-color:rgb(248,248,248)"><span style="color:rgb(29,28,29);font-family:Slack-Lato,appleLogo,sans-serif;font-size:15px;font-variant-ligatures:common-ligatures;background-color:rgb(248,248,248)">> They have new A/C Chillers on the way (Existing Chiller plant was destroyed)</span>  <br></div></div></div><br><div class="gmail_quote"><div dir="ltr" class="gmail_attr">On Fri, Dec 25, 2020 at 3:38 PM Jay R. Ashworth via Outages <<a href="mailto:outages@outages.org" rel="noreferrer noreferrer" target="_blank">outages@outages.org</a>> wrote:<br></div><blockquote class="gmail_quote" style="margin:0px 0px 0px 0.8ex;border-left:1px solid rgb(204,204,204);padding-left:1ex">----- Original Message -----<br>
> From: "Kurt Duncan via Outages" <<a href="mailto:outages@outages.org" rel="noreferrer noreferrer" target="_blank">outages@outages.org</a>><br>
<br>
> Anyone else seeing phone or internet issues due to the AT&T building being<br>
> damaged by the explosion in Nashville ?<br>
<br>
Let's please continue to confine replies here to specific information about<br>
network impacts, and keep the speculation threads to -discuss; thanks to<br>
whomever already started that thread.  I would name them, but the caffeine <br>
hasn't kicked in yet.<br>
<br>
If you're in that building in Nash, we'll be particularly interested in <br>
anything you're allowed to tell us in between bailing.<br>
<br>
Cheers,<br>
-- jr '<admin/>' a<br>
-- <br>
Jay R. Ashworth                  Baylink                       <a href="mailto:jra@baylink.com" rel="noreferrer noreferrer" target="_blank">jra@baylink.com</a><br>
Designer                     The Things I Think                       RFC 2100<br>
Ashworth & Associates       <a href="http://www.bcp38.info" rel="noreferrer noreferrer noreferrer" target="_blank">http://www.bcp38.info</a>          2000 Land Rover DII<br>
St Petersburg FL USA      BCP38: Ask For It By Name!           +1 727 647 1274<br>
_______________________________________________<br>
Outages mailing list<br>
<a href="mailto:Outages@outages.org" rel="noreferrer noreferrer" target="_blank">Outages@outages.org</a><br>
<a href="https://puck.nether.net/mailman/listinfo/outages" rel="noreferrer noreferrer noreferrer" target="_blank">https://puck.nether.net/mailman/listinfo/outages</a><br>
</blockquote></div>
</blockquote></div>
_______________________________________________<br>
Outages mailing list<br>
<a href="mailto:Outages@outages.org" target="_blank" rel="noreferrer">Outages@outages.org</a><br>
<a href="https://puck.nether.net/mailman/listinfo/outages" rel="noreferrer noreferrer" target="_blank">https://puck.nether.net/mailman/listinfo/outages</a><br>
</blockquote></div>
</blockquote></div>
</blockquote></div><br>-- <br>Sent from my Android device with K-9 Mail. Please excuse my brevity.</body></html>