[c-nsp] Upgrading 3x DS-3 to 3x OC-3/100Mbs
Eric Kagan
ekagan at axsne.com
Fri Sep 2 15:11:52 EDT 2005
> We currently have 7206 VXRs fronting the DS-3s with 7500s in
> the core acting as route-relector servers. The 7206s are
> running at about 1% CPU load per mb of inbound traffic; so we
> are seeing >= 40% CPU load.
Which NPE ? How much RAM ?
> We need new terminating equipment for the OC-3s. I'd rather
> not stick everything in one box, or even more than one
> upstream into a single box. My initial thought is to throw
> some 7505s at the problem, but wonder if there is a better
> and cost-effective way to land the OC-3s and come out with
> either multiple FE or GigE to feed the core.
NPE-400, G1 can be more powerful than a 750x. We just upgraded 5
7206VXR/300/256MB to 400, 512MB for much cheaper than new routers.
Eric
More information about the cisco-nsp
mailing list