[e-nsp] stacking with 2 switches.

Fabian fabian.extr at gmail.com
Mon Feb 22 13:47:24 EST 2010


Hi Marcin,

Did you enable the stacking on both X650?

Fabian.

-----Original Message-----
From: extreme-nsp-bounces at puck.nether.net
[mailto:extreme-nsp-bounces at puck.nether.net] On Behalf Of Marcin Kuczera
Sent: dimanche 21 février 2010 21:35
To: extreme-nsp at puck.nether.net
Subject: [e-nsp] stacking with 2 switches.

hello,

I have 2x Summit X650 switch connected with standard stack VIM (2x10Gbit/s).

But..
       Stack Port 1:
          State                  : Operational
          Blocked?               : Yes
          Control path active?   : Yes
       Stack Port 2:
          State                  : Operational
          Blocked?               : No
          Control path active?   : Yes

It seems that only one cable can be used at a time, so there is maximum 
of 10Gbit/s throughput between 2 switches no matter if there is only one 
or both cables..
Is it true ?

Regards,
Marcin
_______________________________________________
extreme-nsp mailing list
extreme-nsp at puck.nether.net
https://puck.nether.net/mailman/listinfo/extreme-nsp



More information about the extreme-nsp mailing list