[Outages-discussion] [outages] Level 3 fiber cut San Bernardino, CA
outages
virendra.rode at outages.org
Wed Oct 31 12:52:46 EDT 2018
Thanks Mehmet. Will ping you offline.
—
regards,
/vrode
> On Oct 31, 2018, at 09:01, Mehmet Akcin <mehmet at akcin.net> wrote:
>
> by the way wanted to share some screenshots of what we are developing.
>
> https://drive.google.com/drive/folders/1JsV7QRaWkzj9W3oEwJe7Qm-vqwXjOdu3?usp=sharing
>
> if you are interested in helping, please contact me offlist.
>
>
>> On Wed, Oct 24, 2018 at 10:44 PM Mehmet Akcin <mehmet at akcin.net> wrote:
>> Lets collaborate
>>
>>> On Wed, Oct 24, 2018 at 10:44 PM outages <virendra.rode at outages.org> wrote:
>>> I was doing something similar. I started to plot outages & heatmaps on tracker.outages.org. I even got some google API hooks to report on weather storms similar to weather.com. I tried to scrape twitter & outages email feeds which was partially successfully as I had to manually vett these outages in the backend. Had to shelf it due to day job. Have some thoughts to resurrect tracker back to life.
>>>
>>> —
>>> regards,
>>> /vrode
>>>
>>>> On Oct 24, 2018, at 12:36, Mehmet Akcin via Outages <outages at outages.org> wrote:
>>>>
>>>> I am trying to get these type of outages reported on http://www.networkatlas.org for easy to visaual display
>>>>
>>>> Will you be able to tell me if centurylink has their kmzs available somewhere publicly? I have looked at but didn’t find it.(they have pdfs)
>>>>
>>>> Mehmet
>>>>
>>>>
>>>>> On Wed, Oct 24, 2018 at 11:06 AM Brian Knight via Outages <outages at outages.org> wrote:
>>>>> We've heard that splicing has been going on for the past several hours
>>>>> on the 264-count cable. Estimated time to finish that splice is 20:00
>>>>> GMT.
>>>>>
>>>>> -Brian
>>>>>
>>>>> On 2018-10-24 07:43, Brian Knight via Outages wrote:
>>>>> > Got a Level 3 fiber cut in San Bernardino, CA going on for about 17
>>>>> > hours now. Our first link alarm was at 3:47pm CT yesterday. $DAYJOB
>>>>> > has two 1G circuits affected.
>>>>> >
>>>>> > Looks like they had a hell of a time getting the replacement cable and
>>>>> > splice conduit installed. Splicing is estimated to start in another
>>>>> > 2.5-3.5 hours on the east side of the cut.
>>>>> >
>>>>> > Here's the latest we received from Level 3.
>>>>> >
>>>>> >
>>>>> > 10/24/2018 12:29:56 GMT -
>>>>> > *** CASCADED EXTERNAL NOTES 24-Oct-2018 12:22:53 GMT From CASE:
>>>>> > 15371425 - Event
>>>>> > The Outside Plant Engineer has reported that cable preparations on
>>>>> > both the west side and the east side of the cable is ongoing. It is
>>>>> > estimated splicing on the west side will begin at 14:00 GMT and
>>>>> > splicing on the east side will begin between 15:00 GMT and 16:00 GMT.
>>>>> >
>>>>> >
>>>>> > 10/24/2018 11:10:34 GMT -
>>>>> > *** CASCADED EXTERNAL NOTES 24-Oct-2018 11:04:06 GMT From CASE:
>>>>> > 15371425 - Event
>>>>> > The Outside Plant Engineer has confirmed the trench is dug and the
>>>>> > replacement cable is being ran between manholes at the west side of
>>>>> > the damage. Preparations are complete at the east side and splicing
>>>>> > expected to begin at 11:30 GMT with the 264 count cable, then the 84
>>>>> > count cable followed by a 60 count lateral cable. Restoration efforts
>>>>> > are ongoing with an ETTR that remains unchanged, 17:30 GMT.
>>>>> >
>>>>> >
>>>>> > 10/24/2018 10:05:30 GMT -
>>>>> > *** CASCADED EXTERNAL NOTES 24-Oct-2018 09:58:52 GMT From CASE:
>>>>> > 15371425 - Event
>>>>> > The Outside Plant Engineer reported the replacement section of cable
>>>>> > got stuck when pulling it into position. A second splice enclosure
>>>>> > will be installed in the next manhole. Field Operations will dig a
>>>>> > trench between the two enclosures to complete the installation of the
>>>>> > 2,400 foot section of 264 count replacement cable. The trench is
>>>>> > expected to be complete at approximately 10:30 GMT with an estimated
>>>>> > time splicing will begin of 12:30 GMT.
>>>>> >
>>>>> >
>>>>> > 10/24/2018 08:08:37 GMT -
>>>>> > *** CASCADED EXTERNAL NOTES 24-Oct-2018 08:01:50 GMT From CASE:
>>>>> > 15371425 - Event
>>>>> > The Outside Plant Engineer reported the replacement section of fiber
>>>>> > cable has arrived and is currently being pulled into position. Along
>>>>> > with the section of fiber cable, a new splice enclosure is being
>>>>> > prepped and will be replaced to complete repairs of the 264 count
>>>>> > cable. The 84 count cable has been prepped and ready for splicing.
>>>>> > Field Operations have moved to an adjacent manhole looking for
>>>>> > available slack to repair to the 168 count cable. The Outside Plant
>>>>> > Engineer reported splicing is expected to commence at 10:00 GMT. The
>>>>> > next update will be sent at that time or if additional information is
>>>>> > received.
>>>>> >
>>>>> >
>>>>> > -Brian
>>>>> > _______________________________________________
>>>>> > Outages mailing list
>>>>> > Outages at outages.org
>>>>> > https://puck.nether.net/mailman/listinfo/outages
>>>>> _______________________________________________
>>>>> Outages mailing list
>>>>> Outages at outages.org
>>>>> https://puck.nether.net/mailman/listinfo/outages
>>>> --
>>>> Mehmet
>>>> +1-424-298-1903
>>>> _______________________________________________
>>>> Outages mailing list
>>>> Outages at outages.org
>>>> https://puck.nether.net/mailman/listinfo/outages
>> --
>> Mehmet
>> +1-424-298-1903
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://puck.nether.net/pipermail/outages-discussion/attachments/20181031/31136b43/attachment.html>
More information about the Outages-discussion
mailing list