----- Original Message -----
> From: "Chris Boyd" <cboyd at gizmopartners.com>

> I wish they had shown how they reconnected the subscriber lines to the 5ESS. The
> “cut” is the easy part, but the “over” would be more interesting.

Over the preceding 3 to 4 weeks, they multipled each line on the IDF to the
incoming 5E, leaving it connected to the cables you saw chomped.

They probably then asked each line card "do you see voltage" and maybe walked 
a single burst of ring along each row (I'm not sure if the 5E line card is
equipped to make those measurements, but I'd assume it's though worth the
component space). 

Then, once they did the cut, they fished out the IDF to Xbar cables, and, 
presumably, recycled them.

The cutover time is 47 second, but the prep and clean probably takes 3 or 4
guys two months.

Cheers,
-- jr 'speculate(informed);' a
-- 
Jay R. Ashworth                  Baylink                       jra at baylink.com
Designer                     The Things I Think                       RFC 2100
Ashworth & Associates       http://www.bcp38.info          2000 Land Rover DII
St Petersburg FL USA      BCP38: Ask For It By Name!           +1 727 647 1274


More information about the Outages-discussion mailing list