[outages] Level 3 fiber cut San Bernardino, CA
Mehmet Akcin
mehmet at akcin.net
Wed Oct 24 15:36:17 EDT 2018
I am trying to get these type of outages reported on
http://www.networkatlas.org for easy to visaual display
Will you be able to tell me if centurylink has their kmzs available
somewhere publicly? I have looked at but didn’t find it.(they have pdfs)
Mehmet
On Wed, Oct 24, 2018 at 11:06 AM Brian Knight via Outages <
outages at outages.org> wrote:
> We've heard that splicing has been going on for the past several hours
> on the 264-count cable. Estimated time to finish that splice is 20:00
> GMT.
>
> -Brian
>
> On 2018-10-24 07:43, Brian Knight via Outages wrote:
> > Got a Level 3 fiber cut in San Bernardino, CA going on for about 17
> > hours now. Our first link alarm was at 3:47pm CT yesterday. $DAYJOB
> > has two 1G circuits affected.
> >
> > Looks like they had a hell of a time getting the replacement cable and
> > splice conduit installed. Splicing is estimated to start in another
> > 2.5-3.5 hours on the east side of the cut.
> >
> > Here's the latest we received from Level 3.
> >
> >
> > 10/24/2018 12:29:56 GMT -
> > *** CASCADED EXTERNAL NOTES 24-Oct-2018 12:22:53 GMT From CASE:
> > 15371425 - Event
> > The Outside Plant Engineer has reported that cable preparations on
> > both the west side and the east side of the cable is ongoing. It is
> > estimated splicing on the west side will begin at 14:00 GMT and
> > splicing on the east side will begin between 15:00 GMT and 16:00 GMT.
> >
> >
> > 10/24/2018 11:10:34 GMT -
> > *** CASCADED EXTERNAL NOTES 24-Oct-2018 11:04:06 GMT From CASE:
> > 15371425 - Event
> > The Outside Plant Engineer has confirmed the trench is dug and the
> > replacement cable is being ran between manholes at the west side of
> > the damage. Preparations are complete at the east side and splicing
> > expected to begin at 11:30 GMT with the 264 count cable, then the 84
> > count cable followed by a 60 count lateral cable. Restoration efforts
> > are ongoing with an ETTR that remains unchanged, 17:30 GMT.
> >
> >
> > 10/24/2018 10:05:30 GMT -
> > *** CASCADED EXTERNAL NOTES 24-Oct-2018 09:58:52 GMT From CASE:
> > 15371425 - Event
> > The Outside Plant Engineer reported the replacement section of cable
> > got stuck when pulling it into position. A second splice enclosure
> > will be installed in the next manhole. Field Operations will dig a
> > trench between the two enclosures to complete the installation of the
> > 2,400 foot section of 264 count replacement cable. The trench is
> > expected to be complete at approximately 10:30 GMT with an estimated
> > time splicing will begin of 12:30 GMT.
> >
> >
> > 10/24/2018 08:08:37 GMT -
> > *** CASCADED EXTERNAL NOTES 24-Oct-2018 08:01:50 GMT From CASE:
> > 15371425 - Event
> > The Outside Plant Engineer reported the replacement section of fiber
> > cable has arrived and is currently being pulled into position. Along
> > with the section of fiber cable, a new splice enclosure is being
> > prepped and will be replaced to complete repairs of the 264 count
> > cable. The 84 count cable has been prepped and ready for splicing.
> > Field Operations have moved to an adjacent manhole looking for
> > available slack to repair to the 168 count cable. The Outside Plant
> > Engineer reported splicing is expected to commence at 10:00 GMT. The
> > next update will be sent at that time or if additional information is
> > received.
> >
> >
> > -Brian
> > _______________________________________________
> > Outages mailing list
> > Outages at outages.org
> > https://puck.nether.net/mailman/listinfo/outages
> _______________________________________________
> Outages mailing list
> Outages at outages.org
> https://puck.nether.net/mailman/listinfo/outages
>
--
Mehmet
+1-424-298-1903
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://puck.nether.net/pipermail/outages/attachments/20181024/dd4db946/attachment.htm>
More information about the Outages
mailing list