[outages] 8x8 outage/111 8th Ave NYC
virendra rode
virendra.rode at outages.org
Tue Oct 30 01:00:57 EDT 2012
-----BEGIN PGP SIGNED MESSAGE-----
Hash: SHA256
Tracker was updated as well.
regards,
/virendra
On 10/29/2012 09:25 PM, Chris Sheats wrote:
> Info from Zayo:
>
> The local power provider in the NY Market, ConEd, has
> intentionally de-energized power systems in the New York
> metropolitan area to reduce system damage as salt water has entered
> the underground infrastructure. Additionally, power outages have
> been observed in the Newark metropolitan area affecting the Zayo
> facility at 165 Halsey. All Zayo facilities that have sustained a
> loss of commercial power are currently operating normally on
> generator backup, and refueling arrangements are being made for all
> Zayo owned generators at this time to ensure continuous operation
> of Zayo facilities and equipment. A current readout by site of our
> current generator runtime is as follows:
>
>
>
> - *60 Hudson (NY)* - 1st Floor MMR (Meet Me Room) 18 Hours of
> generator backup, with additional fuel onsite to replenish the
> generator - 12th Floor has 30+ hours or generator back up - 15th
> and 19th Colocation Floor 30+ hours or generator back up which is
> provided by the building
>
> **Fuel supplier has tankers inside the city of New York to deliver
> fuel to Zayo when necessary.*
>
>
>
> - *111 8th Ave (NY)* - Has 90,000 gallons of fuel, which is able to
> provide up to 4 days of power
>
>
>
> - *165 Halsey (NJ)* - 5th Floor has 17+ hours of generator backup -
> 10th Floor has 30+ hours of generator backup
>
>
> At this point, we are experiencing multiple fiber cuts as a result
> of the storm which has resulted in service interruptions to
> transport services in the Pennsylvania, New Jersey and New York
> markets.
>
>
>
>
> On Mon, Oct 29, 2012 at 9:07 PM, Owen DeLong <owen at delong.com>
> wrote:
>
>> Because salt water and electricity are a bad combination, NY has
>> shut down large sections of power as a precaution in preparation
>> for expected storm surges that are likely to flood many of the
>> underground facilities. These precautionary outages will very
>> likely make it a whole lot easier to restore power much sooner
>> after Sandy finishes pounding the area.
>>
>> It's actually a surprisingly wise thing for them to have done.
>> However, for it to work out well, they would have had to offline
>> the back-up generators and disconnect the battery systems as
>> well. I don't know to what extent that will have happened.
>>
>> Owen
>>
>> On Oct 29, 2012, at 20:39 , Lonnie Bozeman
>> <Lonnie.Bozeman at coresite.com> wrote:
>>
>> They have shut sections of the grid off..
>>
>>
>> Lonnie Bozeman Operations Manager
>>
>> CORESITE (NYSE: COR) 900 N. Alameda St. Suite 200 Los Angeles, CA
>> 90012 USA +1 213.327.1204 | Office +1 213.598.1739 | Cell +1
>> 213.327.1289 | eFax
>>
>> Lonnie.Bozeman at CoreSite.com| www.CoreSite.com
>>
>> Jim Meyer <jim at geekdaily.org> wrote: Our hosts there are not
>> responding as of 10:58p EDT.
>>
>> We've got no news but are assuming it's Sandy coming to town.
>>
>> --j
>>
>> _______________________________________________ Outages mailing
>> list Outages at outages.org
>> https://puck.nether.net/mailman/listinfo/outages
>>
>>
>>
>> _______________________________________________ Outages mailing
>> list Outages at outages.org
>> https://puck.nether.net/mailman/listinfo/outages
>>
>>
>
>
>
>
> _______________________________________________ Outages mailing
> list Outages at outages.org
> https://puck.nether.net/mailman/listinfo/outages
>
-----BEGIN PGP SIGNATURE-----
Version: GnuPG v1.4.11 (GNU/Linux)
Comment: Using GnuPG with Mozilla - http://www.enigmail.net/
iF4EAREIAAYFAlCPXwgACgkQ3HuimOHfh+HwpAD+O7bYXoT/u2zR6y9L5L/62ba/
Hvtif3Pdwt4m+j3eNL8A/1E7f5rXXfDYtPGGJgXF9BO7fvdruIv90pzWX7Qk6tmM
=DiSW
-----END PGP SIGNATURE-----
More information about the Outages
mailing list